I have configured location directives for Raw Material picking as per requirement, however it has now changed to split work based on specific items.
For instance, I have a production order that requires raw material picking and packaging. Requirement is now that packaging material should have its own work created, so I am wondering how I can specify the pick item as separate work for packaging items.