In WMS module, it is possible to create a mobile device menu item for production order report as finish (or report as finished and putaway). In this menu item, is it possible to toggle if worker can End job.
The below settings determine if a route card is posted at the same time when executing RAF on the WMS app:
Production control>Setup>Production control parameters
Route group
My scenario is I have a production order with a route containing two operations.
The first operation will be reported as finished on the web client.
The last operation will be reported as finished on the WMS app. And with the settings above, WMS RAF will only post route card for the second operation along with physical update, which is what I want.
However, when I report as finish on the WMS app and set the End job = Yes, I get the following error because the system does not understand that the route card for the operation it is trying to post should also set End-mark route = Yes.
Am I missing a parameter to configure? Does the system currently not support this function?

Report
All responses (
Answers (