I assigned dimension to the tree but not in order. I have begun to enter my budget and I need to modify the order of the dimensions. When I try to modify this in Budget Tree Maintenance, I get an error saying that I need to delete the budget that is attached to the budget tree that I am trying to delete. I am not trying to delete the budget tree only to move a dimension to a higher level. Is there no way to do this other than deleting everything that I have done in the budget?
*This post is locked for comments