Having returned from the Summit and liking the new R2 features: We upgraded GP10 SP5 to GP2013 SP1 into a test server some time ago and everything checks out with UAT. If I update the GP2013 code to R2 can I still forklift in the GP10 SP5 data, or do I have to upgrade to GP2013 SP1 first, then update to R2?
Thank, Bill
*This post is locked for comments