Hi,
I am trying to run Multi-level cost calculation for a top level item, but it does not explode the BOM and calculate the item costs of the 2nd and 3rd level items.
When I investigated this, I found that if I remove the Refilling warehouse link from one of the BOM items included in the top level BOM, AX then calculates the multilevel costing correctly.
Has anyone come across this issue before? Is there a hotfix / work around solution for this?
Environment - AX 2012 R2
Thanks
*This post is locked for comments
I have the same question (0)