HI,
I am trying to upload the budgets for Analytical Accounting dimension codes (Projects).
The problen is that the excel format that I have is by "dimension code description" not by the code itself.
Is there a way to change this format from description to code. As description of the code can vary but code is always constant with coding convention.
Rahul
*This post is locked for comments