Hi all,

I'm finding something about how to rework a item in AX 2012. That means, this production order are used for products needing repair or reworking.

Thanks in advance.

Phung Luong.

*This post is locked for comments

I have the same question (0)
  • Cam Phung Profile Picture
    997 on at

    Hey,

    I realize that Production Order have no field "rework order" the same as "rework batch" in batch order.

    Who can explain to me this difference ?

    2313.Screenshot_5F00_3.png

  • Suggested answer
    Guy Terry Profile Picture
    28,924 Moderator on at

    Hi Phung Luong,

    Rework functionality is only available on Batch orders (not Production / Works orders). This means you can only use it to rework Items which have Production type = 'Formula'.

  • Suggested answer
    Weaveriski Profile Picture
    23,620 Moderator on at

    You would just create a production order with no BOM and route, choose a production pool of "rework" or some other way to segregate/identify it and then build the BOM and route as the rework dictates. You could have standard rework BOM and routes at a rework warehouse.

  • Cam Phung Profile Picture
    997 on at

    HI Steven,

    That mean when I create a BOM for an item. I much create 2 BOM number. 1 BOM include standard material, 1 BOM have material is parent item.

    When create a rework production order, just change BOM number.

  • Weaveriski Profile Picture
    23,620 Moderator on at

    Yes basically. You do not have to have a rework BOM and it can never be the only active BOM as Planning would hit a cyclical never ending loop.

  • Cam Phung Profile Picture
    997 on at

    Hi Steven Weaver,

    I choose rework order field is Yes in batch order. I perform step by step according material (reservation, route..), however only estimate is available. So I can not continuing with this batch order. Do you know the reason why?

  • Weaveriski Profile Picture
    23,620 Moderator on at

    Probably because of your status setup in your parameters. Estimate it and then move on, if you cannot check the status parameters settings.  

  • Suggested answer
    Sridhar N Profile Picture
    45 on at

    In case normal production order you can select the BOM lines manually this is typically the finished product you need to re-work and any additional raw materials and use production pool to identify re-work order.

    In case of batch order, you have the option to specify the batch order as re-work order

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

Quick Links

Responsible AI policies

As AI tools become more common, we’re introducing a Responsible AI Use…

Neeraj Kumar – Community Spotlight

We are honored to recognize Neeraj Kumar as our Community Spotlight honoree for…

Leaderboard > 🔒一 Microsoft Dynamics AX (Archived)

#1
Martin Dráb Profile Picture

Martin Dráb 4 Most Valuable Professional

#1
Priya_K Profile Picture

Priya_K 4

#3
MyDynamicsNAV Profile Picture

MyDynamicsNAV 2

Last 30 days Overall leaderboard

Featured topics

Product updates

Dynamics 365 release plans