Hello,
We use resource and timesheet to manage project (job) based costing. Job No. and Job Task No. are required on each time sheet line. Approved time sheets get pulled into Job Journal and posted.
When looking into related transactions of posted time sheet, we found it only gets posted to Job Ledger Entries and Resource Ledger Entries. There are no general ledger impacts.
We have gen. prod. posting group set up, and each resource no. has gen. prod. posting group selected. It is the same setup we use on /Item/. When an /item/ gets posted on job journal, it affects general ledger, meaning the posting group works. However, when we post /Resource/ from timesheets on job journal, it does not affect general ledger.
Is this by design or we missed other setup?