i'm hoping you can help me troubleshoot an error that i've been trying to solve for a while now.
I want a maintenance schedule line to be created when either
- a time based interval of 1 year is reached.
- a counter value is expected to reach the value 5000.
I have created a maintenance plan with two maintenance plan lines. One time line and one counter line. According to the documentation, I'm using the Interval type /Linked from last work order/.
As long as I'm only using the one of the criterias, everything works fine. But as soon as i'm adding the second criteria, no maintenance schedule lines are created at all.
If I set the interval type to /repeat from last work order/, I can see maintenance schedule lines for both maintenance plan lines.
Do you have an idea what i'm doing wrong? Or is there a way to trace why no lines are created?
thanks for your help