Hi all,
I have set a plan group in my formula, priority1 is with 44% usage and 0% variable scrap , and priority2 with 44% usage and 15% variable scrap.
But when priority2 has stock, the batch order didn't take the 15% variable scrap into consideration, is there any setting I missed out?