I got a strange behavior (maybe I left something out) - following case:
-> it was tested in the standard BC environment (premium)
Planning parameters of the item:
Safety Stock = 10
Minimum Order Quantity = 100
Order Multiple = 10
The following step show the requisition worksheet:
Why does the system only provide 10 pieces? -> Minimum Order Quantity is 100.


Report
All responses (
Answers (