Skip to main content

Notifications

Microsoft Dynamics GP (Archived)

Post Through GL Concerns

Posted on by Microsoft Employee

Currently we post all transactions to the GL so they need to be approved before they are posted to the GL. Users want to change this to post through the GL so the batches are automatically posted to the GL.

Are they any concerns or things I need to watch out for when changing this?

*This post is locked for comments

  • Community Member Profile Picture
    Community Member Microsoft Employee on at
    RE: Post Through GL Concerns

    Thanks for the feedback everyone. This is what I was looking for.

  • Mahmoud Saadi Profile Picture
    Mahmoud Saadi 32,738 on at
    RE: Post Through GL Concerns

    One important thing to mention as well, If your posting is allowed on the transaction level rather than batch, Dynamics GP will "Post to GL" even if the setup is "Post Through". No "Post through" GL is allowed with transaction posting.

  • Victoria Yudin Profile Picture
    Victoria Yudin 22,766 on at
    RE: Post Through GL Concerns

    One important consideration AFTER you change your posting to "Post Through". Don't just assume that everything is now posting through and you don't have to check it. Someone must be assigned to periodically check the GL to make sure there are no unposted batches sitting there.

  • Verified answer
    Mahmoud Saadi Profile Picture
    Mahmoud Saadi 32,738 on at
    RE: Post Through GL Concerns

    To add up, "Post through" is my recommendation for the daily transactions for one simple reason, the system process is the primary driver for transaction posting as it was originally created. Furthermore, Quality checks and reconciliation should be scheduled to tie sub ledger and general ledger on a routine bases.

    Although, that doesn't make the "post to GL" undesired option. Each case has a a recommended option to adopt, "Post To GL" is desired over "Post Through" in implementation for most of the clients I've worked with.

    An essential article by Etelligent Solutions provides an overall comparison; “Post To” versus “Post Through” in Dynamics GP

  • L Vail Profile Picture
    L Vail 65,271 on at
    RE: Post Through GL Concerns

    Hi,

    I agree with both Sanjay and Mark. If something is not right, it should be corrected at the subsidiary ledger level.

    Kind regards,

    Leslie

  • mpolino Profile Picture
    mpolino on at
    RE: Post Through GL Concerns

    Posting through is recommended. It improves consistency. You can still use security to control and limit who can post direct GL entries.

    Mark

  • Suggested answer
    Community Member Profile Picture
    Community Member Microsoft Employee on at
    RE: Post Through GL Concerns

    The only concern is you will loose the ability to have the batch reviewed before the batch is being posted.

    On the flip side there is one less thing to worry about, batch posted in sub ledger and not posted to GL...

    Cheers!

    Sanjay

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

Quick Links

December Spotlight Star - Muhammad Affan

Congratulations to a top community star!

Top 10 leaders for November!

Congratulations to our November super stars!

Tips for Writing Effective Suggested Answers

Best practices for providing successful forum answers ✍️

Leaderboard

#1
André Arnaud de Calavon Profile Picture

André Arnaud de Cal... 291,253 Super User 2024 Season 2

#2
Martin Dráb Profile Picture

Martin Dráb 230,188 Most Valuable Professional

#3
nmaenpaa Profile Picture

nmaenpaa 101,156

Leaderboard

Featured topics

Product updates

Dynamics 365 release plans