Hi Experts,
Getting error "Production order PRD/000239 could not be scheduled. Not enough capacity could be found" if do scheduling operation.
There are 2 types of scheduling Operations and Jobs.
Getting above error while doing Jobs scheduling but no error getting doing operation scheduling.
Please help me.
Thanks,
Faiz