Hi. I am in the process of developing a new in house timesheet portal. I am ready to begin on the eConnect portion that will take all of the timesheets and create a timesheet batch (similar how PDK could be configure to work). Would someone be able to point me in a starting direction or have a code sample of creating a timesheet batch?
Environment:
2010 SP4
moving to GP 2016 soon
Thanks,
Charles
*This post is locked for comments