User just notified that a voucher was entered and processed and in the Document Maintenance form, the Period Closed is 08-2019 instead of 08-2015. Getting ready for an audit and wanted to find out the best/fastest way to correct this? Can this be done through the back end without effecting anything else? Not familiar with what this period does.
Thanks in advance for all help and suggestions.
*This post is locked for comments