I tried to use the Lead Time Offset Field in the BOM form for an item that I need 4 days after the MO start.
When I put a (-4) value for an item, I create a MO and the picklist shows the required date 4 days before the start date. But when I'm trying to use a positive value, it does not work as I wish, the required date of the item stay at the MO start date.
Manufacturing documentation says I can put a positive value when I'm from the MO start date, so I think it's supposed to work.
Is anybody can help my on this issue?
*This post is locked for comments