When I start production at 3 PM and finish at 2 AM the next day, I have configured the calendar in Dynamics 365 F&O with two working time slots: 3 PM to 12 AM and 12 AM to 3 AM. However, during job scheduling, the system starts operations at 12 AM instead of 3 PM, as it considers 12 AM the beginning of the day rather than 3 PM.
To address this, I removed the working time slot from 12 AM to 3 AM and kept only 3 PM to 12 AM. While this avoids scheduling from midnight, it introduces another issue—overnight production processes are extended into the next afternoon because the calendar doesn’t account for midnight work.
How can I properly configure routes, calendars, and resources in Dynamics 365 F&O to handle scenarios where production scheduling spans two days, starting on one day and ending on the next?