hi
when i try to reset the status of a production order form started to released, i get an error stating
The status cannot be reset from Started to Released on production SER-000005 because of the parameter setup.
what parameter setting must i change to allow this? and will it let me reverse the status if i have receipted against the job? and if so does it reverse all the component consumption etc and put them back into stock?
thanks
mal
*This post is locked for comments
I have the same question (0)