Currently, when you release an Assembly, if the BOM contains a component that is set as Lot Tracking, the system automatically selects the oldest lots for that quantity. However, we'd like to be able to select the lots for the assembly manually.
I know that this is how GP is designed to work but wondering if anyone has any ideas on how to get this done?
Thank you in advanced
*This post is locked for comments