Recently, on a few payroll runs, the Trx Begin Date & End Dates were set to 12/14/16 and 12/27/16 respectively, even though the check date as for 1/6/2016. Are those fields linked to anything else (ie a summary table). How can I correct these since the checks have already gone out?
*This post is locked for comments