I am seeing multiple posting in the ledger for labour (resource) when I process a production order.
- I have a production order with a single route operation for ASSEMBLY, this has a labour cost of 5.50
- On the production order I click START and the legder is updated with the values in screenshot 1 and 2 below. This is what I expect to see.
- Next I RAF and END the production order and I see the ledger postings in screenshot 3 and 4. Some of these are for parts which is all good but you will see the labour is appearing multiple times here (the 5.50 entries)
How can I prevent this?
1
2
3
4
*This post is locked for comments