Announcements
No record found.
Hi,
I have an Assembly BOM where i define the values of Raw Material items.But on Assembly order i want to consume the Raw Material more than i defined in BOM.And at the end of day/month i want to know the extra consumption report.
RegardsAslam
Is the assembly order linked to a sales order? Won’t allow for changes if so.
I think you would have to do a report based on the standard assembly BOM and then what was actually consumed. Someone else may comment on whether this type of detail is easier to extract with production orders. Still feel like it’s a comparison based reporting feature either way
Hi
I agree with Josh. This is more like a report that need to be designed and used. It will be the same situation with Production Order.
Technically you need a report that show you how many of each item you assembled, then what was the BOM usage and what was the actual usage. Then you can calculate your scrap rate.
Under review
Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.
Congratulations to our 2026 Super Stars!
We are thrilled to have these Champions in our Community!
These are the community rock stars!
Stay up to date on forum activity by subscribing.
OussamaSabbouh 1,993 Super User 2026 Season 1
YUN ZHU 1,116 Super User 2026 Season 1
Khushbu Rajvi. 557 Super User 2026 Season 1