Project status is closed but still has a balance in WIP. Do I move these out by journal entry or is there a way to move them out through the PA module?
*This post is locked for comments
I have the same question (0)

Project status is closed but still has a balance in WIP. Do I move these out by journal entry or is there a way to move them out through the PA module?
*This post is locked for comments
I have the same question (0)