Low Level BOM Items not included in Planning Worksheet

Posted on by 30

Hello All,

I am facing issues with Planning Worksheet not being able to generate a demand for Low Level BOM Items.

Currently Planning Worksheet is only generating PO for the assembly/finished item and not generating demand for items which are at Level 1,2,3... (Low Level Items)

I have attached a screenshot of Planning Worksheet & Manufacturing Setup

pastedimage1667328866080v2.png

Manufacturing Setup:

Manf-Setup.png

Planning Parameters:

pastedimage1667331271880v1.png

Replenishment:

pastedimage1667331300348v2.png 

  • Low Level BOM Items not included in Planning Worksheet

    Hi Aman,

    I am also trying to do the same. But as per your screenshot, you have put a filter for the master finished good item. If you put a filter on the calculate planning worksheet window, as per my knowledge it only considers the filters item (even though it has sub-assemblies). 

    Let me know if you find a method. 
  • Aman Sodera Profile Picture
    Aman Sodera 30 on at
    RE: Low Level BOM Items not included in Planning Worksheet

    Hi Robert

    Thank you for taking the time to answer my query.

    I do have a reordering policy (L4L) under planning parameters (screenshot attached),

    I also have a replenishment system (screenshot attached) &

    The low level item nos are assigned to the assembly BOM

    Let me know if I am going wrong at any point.

  • Suggested answer
    Robert Jolliffe Profile Picture
    Robert Jolliffe 859 on at
    RE: Low Level BOM Items not included in Planning Worksheet

    Let's imagine a 3 level BOM

    Item A101 - FG assembly

     Item B202 - Sub Assembly with purchased items

       Item C300 - A purchased Item

    For you to generate a planned purchase order for Item C300 then all three Items (A101, B202 and C300) need to have a replenishment system (eg B202 would be production order) and a Reordering Policy (eg: B202 might be Lot for Lot)

    If B202 has no reordering policy OR has the wrong replenishment system you won't end up proceeding all the way to C300.

    Also the BOM need to be assigned to the item(s) that have a BOM.

    The best thing to do is open A101 in items and look at Bills of Material|Cost Shares which will show the multi-level exploded BOM.  If you don't see B202 or C300 on that list, then the BOM might be missing or the replenisment system isn't setup correctly.

    Does that make sense?

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

Quick Links

December Spotlight Star - Muhammad Affan

Congratulations to a top community star!

Top 10 leaders for November!

Congratulations to our November super stars!

Tips for Writing Effective Suggested Answers

Best practices for providing successful forum answers ✍️

Leaderboard

#1
André Arnaud de Calavon Profile Picture

André Arnaud de Cal... 291,269 Super User 2024 Season 2

#2
Martin Dráb Profile Picture

Martin Dráb 230,198 Most Valuable Professional

#3
nmaenpaa Profile Picture

nmaenpaa 101,156

Leaderboard

Featured topics

Product updates

Dynamics 365 release plans