We are handing case like below points.
Case : User creating the sales order and production order for the FG Item number MTB001,
For Eg:
i) Currently active BOM ID is AXV1 for the FG item MTB001
ii) BOM ID AXV1 is consist of 10 BOM lines with 2 SFG and 8 RM lines
iii) Now running master plan system exploding requirement of BOMID: AXV1
vi) Now user wants to include some items, So revising the BOM and naming it as BOM ID AXV2 for the same FG item and made this as active.
v) Now the BOM AXV2 consist of 15 BOM lines with 5 SFG and 10 RM lines
vi) Now while regenerating the master plan system still considering the BOM ID AXV1 and not exploding for BOM ID AXV2, Why because production order created with the previously active version of AXV1.
vi) User requirement is wants to explode for the new active BOM ID: AXV2.
Note: We cannot able to reverse the production order, because the they partially posted the picking list.
Kindly request to suggest the solution.