If a worker doesn't work the full day, but is paid for his time off, the paid time off calculates at the correct labor rate for the employee, however all of the other activities for the day list an incorrect labor rate. In most instances, the labor rate is 1/2 the actual employee labor rate, but not always. Is this a bug in AX 2009 with a hotfix, or is this a shop floor setup issue?
*This post is locked for comments
I have the same question (0)