RE: Document date posting error
:The PSTL tools should have been install by whomever installs/updates your software. It is an item on the feature list of GP. If you do not have it, you can use Programs & Features option in Control Panel to modify the installation. Each workstation needs the product installed if it is not. Here's the add Features window that will launch from the Programs & Features selection if you choose Change:
To check the installation, edit the Dynamics.set file with notepad. The PSTL product will be listed as product 1838. It is named Technical Service Tools:
Top of Dynamics.set file.
Bottom section of Dynamics.set file.
To address your second question. Whether or not it will post to the GL on a specific date is totally under your control. What der ate do you want to use for the post? GP will properly roll over any transaction that you post to history. The void window contains two dates, both are editable so you can change them. The dates are marked below:
I hope this helps answer your question. Please let us know.
Kind regards,
Leslie