I have several spreadsheets that are linked to the P&L spreadsheet exported from Management Reporter. I have always "parsed" the beginning and ending dates using excel's MID function, (since it is exported as a string), in the cells in order to do calculation of # of weeks between dates, etc. In FRx, the date was always exported with the same number of digits regardless of the number of actual digits, ie, 01/01/2015 is the same length as 10/10/2015. Management Reporter changes the date to 1/1/2015 which makes all of the date calculations error out. Is there a way to force the date to be formatted with the full digits, same as FRx used to do?
*This post is locked for comments