Dear experts,
My scenario is create a sales order with 10 pcs of product A, the required delivery date is today (Ex: 12-Aug-2015). Currently, the on hand of A is 0. When I calculate ATP the system suggest the confirmed ship date is tomorrow (13-Aug-2015). Is this the standard behavior of system (AX 2012)? Why system assume the lead time is 1 day.
Note that, I do not maintain any lead time for Sales, Inventory or Production in Item Master. I also do not maintain lead time in shipment tab of AR parameters.
Best Regards
Truc Nguyen
*This post is locked for comments
I have the same question (0)