Any ideas if it is possible to run a budget report (12 month column layout) based on Draft budget figures (before budget register entries updated.
I want to check the data we have entered is correct before 'posting' it as there is a lot of room for error here.
thanks
*This post is locked for comments
I have the same question (0)