Hi,
Currently i am trying to setup the following flow using mixed-mode (Lean Manufacturing+Discrete Manufacturing):
This scheme is the easiest one to show you what i want to do.
I setup the above flow in Microsoft Dynamics AX 2012 R3 and my main goal is to refill all the warehouses using transfer kanbans instead transfer orders (each arrow is a transference). I did that in Lean manufacturing process, all replenishment from Raw material wharehouse and Discrete production are done through transfer kanban corretly. But from Raw material warehouse to discrete production I can't setup that. There are any way to do that or it is just impossible to replenishment a resource (discrete manufacturing) using transfer kanbans?
This is what I already tried:
- In the same production flow I added an transfer activity to transfer raw materials to resource (discrete production). I created a new kanban rule (Type: withdrawal; Replenishment strategy: Event) and BOM line event: Automatic. But when i create and estimate a production order it didn't create any transfer job.
I hope someone can help me with this issue,
Thank you in advance
*This post is locked for comments
I have the same question (0)Hey guys!! Any help regarding it?? thank you
Well today I was seeing a setup to try during the estimation of Production Order, Ax auto-create a transfer kanban in order to replenish my discrete production from RW WH. To do that I created a Production Flow with an only activity (transfer) and a kanban rule (type transfer) event with option BOM line event set as automatic.
For what I read with this setup AX should "create" a transfer kanban when I estimate Production order. But not for me. Anyone faced that before? thanks :)