Hi,

Currently i am trying to setup the following flow using mixed-mode (Lean Manufacturing+Discrete Manufacturing):

This scheme is the easiest one to show you what i want to do.

  • I have in the first rectangle the raw materials warehouse. Here is where I purchase all the materials that I will need for my production process.
  • Second rectangle (different warehouse) I have a resource (machine) where i will use productions orders (instead Lean). I want to control it with discrete manufacturing because this process is the bottleneck of my production and it's important to control setup times in order to reduce times and improve that.
  • Finally the last rectangle (third one, another warehouse) it will be Lean Manufacturing where I get the final product.

 

I setup the above flow in Microsoft Dynamics AX 2012 R3 and my main goal is to refill all the warehouses using transfer kanbans instead transfer orders (each arrow is a transference). I did that in Lean manufacturing process, all replenishment from Raw material wharehouse and Discrete production are done through transfer kanban corretly. But from Raw material warehouse to discrete production I can't setup that. There are any way to do that or it is just impossible to replenishment a resource (discrete manufacturing) using transfer kanbans?

 

This is what I already tried:

- In the same production flow I added an transfer activity to transfer raw materials to resource (discrete production). I created a new kanban rule (Type: withdrawal; Replenishment strategy: Event) and BOM line event: Automatic. But when i create and estimate a production order it didn't create any transfer job.

 

I hope someone can help me with this issue,

Thank you in advance

*This post is locked for comments

I have the same question (0)
  • Community Member Profile Picture
    on at

    Hey guys!! Any help regarding it?? thank you

    Well today I was seeing a setup to try during the estimation of Production Order, Ax auto-create a transfer kanban in order to replenish my discrete production from RW WH. To do that I created a Production Flow with an only activity (transfer) and a kanban rule (type transfer) event with option BOM line event set as automatic.

    For what I read with this setup AX should "create" a transfer kanban when I estimate Production order. But not for me. Anyone faced that before? thanks :)

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

Quick Links

Responsible AI policies

As AI tools become more common, we’re introducing a Responsible AI Use…

Neeraj Kumar – Community Spotlight

We are honored to recognize Neeraj Kumar as our Community Spotlight honoree for…

Leaderboard > 🔒一 Microsoft Dynamics AX (Archived)

#1
Martin Dráb Profile Picture

Martin Dráb 4 Most Valuable Professional

#1
Priya_K Profile Picture

Priya_K 4

#3
MyDynamicsNAV Profile Picture

MyDynamicsNAV 2

Last 30 days Overall leaderboard

Featured topics

Product updates

Dynamics 365 release plans