Hi all,
I have an inventory Item No 1696 with Replenishment System = Purchase, Reorder Policy = Fixed Reorder Qty. I have multiple locations and would like to use the requisition worksheet to calculate the requirements for multiple locations with respecting planning parameter enabled. The actual results turned out did not consider a second location demand, and the result did not respect the reorder Quantity as well. I need some help to identify what is wrong here. Thank you for your help.
1. Item 1696 and Item card Planning
- Purchase UOM = BOX
- 1 BOX = 20 PCs (base UOM = PC)
- Replenishment System = Purchase
- Reorder Policy = Fixed Reorder Qty.
- Safety Stock Qty = Reorder Point = 30
- Reorder Qty = 40
- Lead Time Cal. = 1D
Order Modifiers:
Inventory on Hand
- Location A = 15
- Location B = 0
- Location C= 0
Qty on Sales order = 80
- SO 1 Location B = 10 requested date = 2/4/2022
- SO 2 Location B = 50 requested Date = 2/25/2022
- SO 3 Location A = 20 requested date = 1/31/2022
Qty On PO = 0
Qty On Job - 0
Run requisition worksheet to calculate Plan:
- Start Date = 1/1/2022
- Ending Date = 3/31/2022
- Item No = 1696
- Respect Planning Parameters
Actual Result:
- Item 1696 location A New PO Qty = 1 BOX Due date 1/24/2022 ( did not respect the Fixed Reorder Amount = 2 Box = 40 Base UOM)
- no PO is suggested for location B
Expected Result:
- Item 1696 Location A PO Qty = 2 BOX due date /30/2022
- Item 1696 Location B PO Qty = 1 Box due date 2/3/2022
- Item 1696 Location B PO Qty = 2 Boxes due date 2/24/2022