Hello,
I have found conflicting information on the upgrade path from Great Plains 8 to GP 2013.
Current Prod: SQL 2000 & Great Plains 8.0 SP4
Mid-Step: Server 2008 R2/SQL 2008 R2
Future Prod: SQL/Windows Server 2012 and GP 2013
If updating to Great Plains 8 SP5 is not an option, what is the quickest path from 8.0 to GP 2013?
Thank you
*This post is locked for comments
I have the same question (0)