In the example below - I have the items Raw-00172 set up to use mm as base UOM and then secondary UOM is LEN, where 1 LEN = 13000mm.
When I run the order planning, the demand was 27000mm, needed Quantity is 2.07 LEN's then - but what do I change so that my Qty. to Order is always a whole number, in this case 3 (it should always round up)