I was trying to create a report that had actuals for YTD and Budget for the remaining year, non-printing with just the totals.
MR doesn't seem to allow BASE:12 as an option.
this is super high level but this is what i am trying to accomplish:
| Actual |
Budget |
Budget |
Calc |
| 1:BASE |
BASE:12 |
BASE |
a+b-c |
| NP |
NP |
NP |
|
so basically in period 8 it would be
Actuals 1:8
+Budget 8:12
-Budget 8
------
Actual 1-8 and Budget 9-12
thanks,
-MH
*This post is locked for comments
I have the same question (0)