I am having a problem with trying to utilise the MPS function of Business central to replicate my production environment.
We have 25+ work/machine centres for assembly and manufacturing routings that all require an operator to run each station. The issue is that we have 10 operators, for example, so we would be unable to run all work/machine centres at the same so would need the MPS to account for blocking out 15 work/machine centres while the other 10 are occupied, is this possible to implement within Business Central?