Hello all..
Do you know how to setup scrap (% or Qty) at Production Order level?
What I want is that If I have a Sales Order for item AS001 for 10 PCS, and I know this item during production has a 20% of Scrap, consider the consuption based on Qty + Scrap.
For instance.. In my BOM, In order to produce 1 PCS of AS001, I need 2PCS of SA002 (I produced this too), so in fact I need 20PCS in total. But as I have 20% of scrap, I want my Work Order be created for 10PCS ONLY, but I want consider that I will need 24PCS of SA002 instead of 20PCS only.
I found Settings in ReleaseProduct Engineer but as I'm able to set Variant and Constant values at the same time, I'm not sure this setting would work for me.. In addition even if that were the setting I'm looking for, I would like to personalize Scrap on each work order(for same item), Somtimes 20%, sometimes 10%, depending of circunstances.
Right now If I know my scrap is 20% I and my Sales line is for 10 PCS, I create the Work Order for 12PCS but I don't like this approach Because in order to get Report Reminder as Finish = 0 I need to report 12 PCS as OK.
We are running AX2012 R3 CU12
Thx all in advance.