Im setting up work centre in the manufacturing module. One of the requirements is to select location code that the work centre is associated to. The location code from the work centre card is empty meanwhile i have created many locations on the system.

  • Suggested answer
    Ben Baxter Profile Picture
    5,617 Super User 2025 Season 1 on at
    RE: Missing Location codes while setting up Work Centre

    Bin Mandatory is required for the Location to be visible in the Work Center drop down menu.  Any Location without Bin Mandatory are not visible in the drop down.  This is not a bug, it is by design as the system uses this information based on other setup choices in a Bin Mandatory Location.

    If you do not use Bins, and Bin Mandatory is not set, you do not need to use the Location Code on the Work Center.

  • Haakeem2022 Profile Picture
    72 on at
    RE: Missing Location codes while setting up Work Centre

    No

  • Marco Mels Profile Picture
    on at
    RE: Missing Location codes while setting up Work Centre

    Hello,

    On the location card page, did you set the Bin Mandatory field to enabled?

    Thank you.

  • Haakeem2022 Profile Picture
    72 on at
    RE: Missing Location codes while setting up Work Centre

    I mean when i click on the drop down menu to pick a location, nothing is there

  • Guy McKenzie Profile Picture
    1,330 on at
    RE: Missing Location codes while setting up Work Centre

    Do you expect the location to automatically populate on the work centre? This needs adding manually if so.

    Or do you mean when you click on the drop down menu to pick a location, nothing is there? This is a bug.

    For clarification, you don’t have to have a location code on the work centre. Imho, it makes sense to do so but it isn’t a requirement.

    The location on a production order will be driven by planning if you use MRP, planning or order planning to create them. If you create a production order manually, You will need to add the location code to the prod order anyway. This prod order location will dictate the material consumption and output location/bin.

    The location and bin codes on the work centre do allow you have consumption or output posted to or from a specific bin if the work centre is the first or last operation on the routing. That is the primary purpose of these fields.

Under review

Thank you for your reply! To ensure a great experience for everyone, your content is awaiting approval by our Community Managers. Please check back later.

Helpful resources

Quick Links

🌸 Community Spring Festival 2025 Challenge 🌸

WIN Power Platform Community Conference 2025 tickets!

Jonas ”Jones” Melgaard – Community Spotlight

We are honored to recognize Jonas "Jones" Melgaard as our April 2025…

Kudos to the March Top 10 Community Stars!

Thanks for all your good work in the Community!

Leaderboard

#1
André Arnaud de Calavon Profile Picture

André Arnaud de Cal... 294,101 Super User 2025 Season 1

#2
Martin Dráb Profile Picture

Martin Dráb 232,866 Most Valuable Professional

#3
nmaenpaa Profile Picture

nmaenpaa 101,158 Moderator

Leaderboard

Featured topics

Product updates

Dynamics 365 release plans