Hi ,
I'm wondering if it's possible for me to consume the material while i'm posting the route journal, then i know the actual material consumed instead of using the picking list journal.
The problem i have now is materials are consumed when i post the picking list, and by the end of month, if not all the materials picked are not consumed , i won't be able to know the actual material cost of the finished product.