Thanks Roohi, this gets me closer. When using a Requirement Group, the scheduler wants to book all the items for the same time. Let me give you a different scenario.
An athlete is heading to a fitness facility that allows scheduling of equipment, trainers, coaches, etc. I need to schedule a Treadmill for 30 minutes, a weight bench for 60 minutes and a trainer to assist for the first 30 minutes of the time the weight bench is reserved weight bench.
Weight Bench (facility/equipment) 8:00 - 9:00
Trainer (a contact) 8:00 - 8:30
Treadmill (facility/equipment) 9:00 - 9:30
When I add these items to a Requirement Group, it reserves everything from 8:00 - 9:30 when I need each individual piece of equipment/trainer to be scheduled for different time slots. Is there a way to use a Requirement Group and still be able to split out each item to its own individual time slot?