We are currently using Microsoft Dynamics GP 11.00.1752 (SP2) and implementing ACH for US HSBC bank. US -NACHA-CCD format type has been selected with pad locks.
US HSBC is requiring us to change the effective date field in the Batch Header to be at least one day AFTER the Transmission Date.
Any ideas would be appreciated.
*This post is locked for comments