Hi,
There is difference between BOM Quantity and Picking List Proposed Quantity in Production.
Example: To Manufacture A1=1, RM A=152 is required as per BOM.
But when I run Production Order for A1 quantity 3 RM A=152*3=456 should come, but in Picking List Proposed quantity shows 501 and consumption quantity also shows 501.
Can anybody help me whey the difference.
Thanks
*This post is locked for comments
I have the same question (0)