I need to set up a MRP batch to run once every 24 hours. I have a FG. Under that FG I have several WIP items as well as RM. however there are multiple items NOT associated with my FG. Can I set up a item group? or something to capture or filter only those items related to my FG in a specific Batch job?
Thanks