Hi,
When I go to Assembly Order statistics I found a report please describe the fields.
In Assembly Overhead which values are come from the assembly orders ?
In given screenshot i just have Raw Materials (Not Resources)
Regards
Hi
I have been told that calculated based on parts in assembly BOM if those have Indirect Cost % in there Item card. For example if Part A in assembly BOM has Indirect Cost % (in item card) such as 10% then 10% of last direct cost will consider overhead. You can test this by adding indirect cost % to one of your items.
Also what is your costing method because sometimes costing method can impact the calculation.
In addition, "overhead rate" in item card (it is not viable) can impact that too.