In the Production order Defaults tab Report as Finished you have an option under Report as Finished Journal "Accept error".
The option is also available on Production Control Parameters under tab Journals.
When setting the Accept error to Yes it allows you to report more then started. For the customer I am currently working for this is a very common scenario, they do not have a discrete manufacturing process, but a process where they never know exactly upfront what will be the output. Summarizes the starting quantity will never match the RAF quantity.
The material consumption backflush methods for the batchorders we use is either "Manual" or "Finish" depending on the type of material. For the material with backflushing method "Finish" the posted quantities are correct, it is in-line with the RAF quantities. which means the expected quantities of material are posted based on the RAF quantities. The materials with backflushing method "Manual" are manual posted, the quantities are determined by the user, in some cases the materials are weighed and the weighed quantity is posted.
Now my question: Is using "Accept error" the correct setting in the described scenario or is there another setting to consider? What other implications does this setting have? The naming "Accept error" is in my opinion a bit confusing.