Hello folks, I'm having some issue pinpointing what's causing a certain behavior in the master planning.
Let's make an example:
I've created a sales order SO0001 for item ITEM-A1 , config 0001
The ITEM-A1 config 0001 order type is production and has the BOM BOM0001 with 2 lines:
line 1 , phantom, --> ITEM-P1 (production, has its own bom)
line 2 --> ITEM-G1 (purchase)
When master planning runs, it consistently doesn't explode the sub level: in the explosion form all that I see is the PLO production order for the ITEM-A1, I was expecting a "dynamic" PLO for the ITEM-P1 and all the stuff enderneath it, and the purchase PLO for ITEM-G1.
If I then decide to hit the button "explosion" in the explosion form (the so callled Mini-Mrp) it correctly explodes and shows the ITEM-P1 dynamic PLO and the ITEM-G1 purchase PLO
If I create another Sales Order SO0002 on another item, let's say ITEM-B1 config 0004, that has the same exact bom BOM0001 the master planning explodes correctly and magically "fixes" also the explosion in the previous sales order
The bom is approved/active, bom dates are ok, I've run the recalculate bom levels a thousand times already
For both the ITEM-A1 and ITEM-B1 the coverage is the same.
I've the feeling I'm missing something very basic.
Any suggestion is deeply appreciated.
Thanks