When i´m running a demand based replenishment for a sales order that have some items on picking locations fulfilling the sales order. While other items are placed on other parts of the warehouse in two different zones where we need to do a demand replenishment i´m able to run the replenishment to a single stage location, as well as getting the replenishment to the pick-locations of the items.
But when i try to run the split the work so that each zone gets it´s own work and staging location, i´m running into the following error, which i´m not able to figure out why:
Not all quantity accounted for when creating replenishment links for work line (ItemId = 1033204, InventDimId = #0000000150001DA2). Quantity needing replenishment was 1,00, but replenishment links were only created for 0,00.
The item have fixed location for product variant, and if i remove the item from the load, the next item gives the same error.
Has anyone ecnounted the same error and can shed some light on this?