Hi Experts
I have the plan to start a new project and need help if it's possible to do. For example, i have Warehouse 1 with location 1 for manufacturing. Then I have Warehouse 2 location 1 for testing. Its possible set up batch running every night to move everything that is in WH1 loc1 to WH2 loc2 automatically????
Thanks for your reply
Peter
*This post is locked for comments
I have the same question (0)