Hi, I hope you can help me. I have a project in foreign currency Dynamics SL 2015 CU1, to make receipt of goods inventoried for projects cease to be a committed and no longer reflected in the draft, in the same way if a material outlet is assigned to the project , it is not reflected in the project. they are only reflected if the project is defined in base currency.
Thanks a lot!