I have a working GP2013 R2 environment however after deploying reports through Reporting Tools Setup I still have a red circle with a line through it with the Not implemented status.
I have tried to deploy locally as well as a network share.
I have full admin rights to everything.
What am I possibly missing...(I did not have this problem with GP2010)
Thank you GP Gurus...
*This post is locked for comments
I have the same question (0)